We build for the future
Finished

Construction of Quality Control Terminal Building

Project description

Construction of one-storey service hall with two-storey inbuilt facility for administrative and storage purposes. The whole building is founded on piles, its carcass is made of prefabricated columns and steel roof structure. The roof is flat with PVC hydro isolation, covered with sandwich panels. A reinforced-concrete dumb well is copying the whole length of the hall (155m). The industrial flooring is covered with final epoxy coating.

  • Investor
    Hyundai Motors Manufacturing
  • Place
    Russian Federation / St.Petersburg
  • Project duration
    10/2009 - 07/2010
  • Type of project
    Industrial Buildings
  • Supplier
    PSG Construction a.s.

Our recent projects

All references