Three floor building consists of reinforced concrete frame combined with insulating brick fillings. The structure is based on piles. The roof is solved with the use of timber trusses with joint strap. Part of the projest is also construction of roads, drainage, lighting and fencing of the whole area. Turnkey delivery includes school technology too.