Since November 2009, PSG-International was working on the second phase of the Project, known as MMK II. This phase of the Project included complete reconstruction of the rolling bed - 2500mm wide (STAN 2500). The project was executed in extreme conditions due to the fact that the production could not have been stopped and the works must have been carried out during the full operation. As part of the MMK II, PSG-International was undertaking very complex structural modifications of the existing production facility to enable the Client to install more modern and efficient technological equipment. The Works on MMK II, in the total value of USD 129M were completed in March 2011.