We build for the future
Finished

Outdoor swimming pool Jizni Svahy Zlin

Project description

The facility is divided into several parts – service building, outdoor pools and hard surface, relax grass areas and parking place with drivery. In the service building there are changing rooms, sanitary facility, showers, cash desk, refreshments, room for lifeguard and first-aid room, technological room with junction exchange station and room for filtration and water preparing. There are 4 outdoor concrete swimming pools with plastic foil surface – swimming pool 25 m, relaxation pool, kids pool and pool with water slide and spiral chute. The swimming pool serves for recreation and relax only.

  • Investor
    Statutární město Zlín
  • Place
    Czech Republic / Zlin
  • Project duration
    05/2010 - 03/2011
  • Type of project
    Civic facility buildings
  • Supplier
    PSG Construction a.s.

Our recent projects

All references