We build for the future
Finished

PEGAS – NS a.s. – Production line no.10

Project description

A new building of production hall for non-woven textile production, including administrative and technological annex building, a new transformer and a retention reservoir. The works included utility lines, building up new hard landscaping, complete delivery and assembly of technology service complex, i.e. polyprophylene storing and transport, equipment of the transformer, process water cooling and compressor room with piping of compressed air. The bearing structure is a steel frame with compound wall cladding and sandwich cladding of the roof. The annex buildings are partly monolithic and partly pre-cast, ceilings are monolithic and filigraned too. The structure is founded on piles, only the administrative annex is on monolithic continous footing. The basement is monolithic.

  • Investor
    PEGAS – NS a.s.
  • Place
    Czech Republic / Znojmo
  • Project duration
    07/2010 - 08/2011
  • Type of project
    Industrial Buildings
  • Supplier
    PSG Construction a.s.

Our recent projects

All references