We build for the future
Finished

Production and storage hall for ZPS - GO Zlín

Project description

PSG Construction a. s. has started the turn-key delivery of a production and storage hall for the company ZPS-GENERÁLNÍ OPRAVY, a. s. This new building will be situated in the area of a former crane track and will be connected to the existing production hall. The object is designed as a steel structure cladded with wall panels. The total area of the object will be almost 1500 m2 and all works will be accomplished by the end of April 2017.

It is a steel structure cladded with wall panels with padded concrete socle, roofed with trapezoidal plate and PVC waterproofing. All cabins will be accessible through the crane track as well as the connection to the existing production hall.


  • Investor
    ZPS-GENERÁLNÍ OPRAVY, a. s. Zlín
  • Place
    Czech Republic/Zlin
  • Project duration
    10/2016 - 04/2017
  • Type of project
    Industrial Buildings
  • Supplier
    PSG Construction a.s.

Our recent projects

All references