The extension of the existing hall for beverage can production plus roads and parking places. It is a pre-cast concrete structure with steel roof and roof cladding. The building is founded on piles, cladding is made of sandwich panels. This new structure will serve as a storage, switching station, underground reservoir of water treatment etc. There are 30 new parking places and a new road too.