Steel structure - power station Počerady

Project description

PSG delivers main steel structure objects for a new energetic source of CEZ Group in the Czech Republic. It is a steam-gas power plant with the output 840 MWe, which is located in the area of existing coal-fired power plant in Pocerady.

The structure consists of 3 parts, a turbine room, a machine room extension and a control room with a switchroom. The turbine room is a single-nave hall 28 metres wide with two-nave addition of control room and switchboard room on one side and two-floor single-nave addition on the second side. The turbine will be located in the central nave.

  • Investor
    ČEZ, a.s./ Vodohospodářské stavby, spol. s r.o.
  • Place
    Czech Republic / Počerady
  • Project duration
    04/2011 - 09/2012
  • Type of project
    Reinforced Concrete Structures
  • Supplier
    PSG Construction a.s.