PSG delivers main steel structure objects for a new energetic source of CEZ Group in the Czech Republic. It is a steam-gas power plant with the output 840 MWe, which is located in the area of existing coal-fired power plant in Pocerady.
The structure consists of 3 parts, a turbine room, a machine room extension and a control room with a switchroom. The turbine room is a single-nave hall 28 metres wide with two-nave addition of control room and switchboard room on one side and two-floor single-nave addition on the second side. The turbine will be located in the central nave.